Infinity Tunnel

This design build by OEC is 27’ long x 10’ high 5’ wide and composed of a steel sub-frame, holding 1 and 2 way mirrors, architectural mesh, lights, and glass, all designed and fabricated at our Chantilly fabrication facility, and installed by our expert installers.


ClientHilton InternationalDate2017MaterialsSteel, Mirror, Lighting, GlassBase DesignThe Rockwell Group, JLL Construction

OEC Engineering Corporation


4280 Henninger Ct, Suite K,Chantilly, VA 20151Phone: (703) 802-8988Fax: (703) 802-8749

Hours


Monday: 6:00 — 4:30Tuesday: 6:00 — 4:30Wednesday: 6:00 — 4:30Thursday: 6:00 — 4:30Friday: CLOSEDSaturday: CLOSEDSunday: CLOSED