Engineering Project 2017
Infinity Tunnel : Hilton International
Project Overview
This design build by OEC is 27’ long x 10’ high 5’ wide and composed of a steel sub-frame, holding 1 and 2-way mirrors, architectural mesh, lights, and glass, all designed and fabricated at our Chantilly fabrication facility, and installed by our expert installers.
Date: 2017
Materials: Steel, Mirror, Lighting, Glass
Base Design: The Rockwell Group, JLL Construction