Engineering Project 2017

Infinity Tunnel : Hilton International

Project Overview

This design build by OEC is 27’ long x 10’ high 5’ wide and composed of a steel sub-frame, holding 1 and 2-way mirrors, architectural mesh, lights, and glass, all designed and fabricated at our Chantilly fabrication facility, and installed by our expert installers.

Date: 2017

Materials: Steel, Mirror, Lighting, Glass

Base Design: The Rockwell Group, JLL Construction

Schedule an Appointment